Metro & infrastructure

Where metro and other infrastructure stand for homebuyers.

These notes are part of the full set of guides.

The collection beside this one is Plots, villas & special formats.

Another grouping is Possession & after-purchase.

Metro viaduct and road works with an excavator in east Bengaluru Insights
By Gaurav Mongia

East Bengaluru infrastructure projects: where does each one stand in October 2026?

Of the big east Bengaluru infrastructure projects, only the Purple Line metro and the STRR's Dobaspet–Hoskote section are running. The Blue Line's Silk Board–KR Puram stretch is reportedly targeting May 2027. Suburban rail to Whitefield is still acquiring land. PRR-1's eastern packages aren't tendered, and the KR Puram–Hoskote metro is only a project report.

Read guide
Metro train on an elevated line beside apartment buildings and station stairs Blog
By Nitin Gupta

15 questions before buying near a metro station

Before buying near a metro station in Bengaluru, check the line's real stage (running, under construction or only proposed), walk the route to the station gate, and listen for noise from the viaduct. Ask how long construction will block your road, and what markup you're paying. Dates slip: the Blue Line's full opening is now reported for March 2028.

Read guide
Passenger train passing homes and coconut trees on the city outskirts Blog
By Gaurav Mongia

Bengaluru suburban rail stations: nearby areas for homebuyers

Bengaluru suburban rail stations are being built on two of the four corridors. K-RIDE has named 12 stations on Corridor-2 (Mallige) and 18 on Corridor-4 (Kanaka) in its station contracts. None is open. Reported targets are December 2028 for Mallige, June 2029 for Kanaka and March 2030 for the other two.

Read guide