In Short Pay for the line that is in the sanctioned plan and in the agreement for sale, with a specification and a person who maintains it. A video door phone, a generator wattage, a sewage plant or a clubhouse that appears only in the brochure can be dropped or redesigned. Section 14 of the Real Estate (Regulation and Development) Act, 2016 ties the promoter to the plans and specifications already disclosed, and a change to the common areas needs written consent from at least two-thirds of the allottees, other than the promoter.
If a line is missing from both the plan and the schedules, you have not bought it.
What actually binds the promoter
Section 14(1) says the project is to be developed and completed in accordance with the sanctioned plans, layout plans and specifications approved by the competent authority. Once those plans, and the fixtures, fittings, amenities and common areas, have been disclosed to the person agreeing to take the flat, section 14(2) limits what can change.
A change to the fixtures, fittings and amenities of the flat you agreed to take needs your previous consent. The Act allows minor changes the allottee asks for, and minor changes an authorised architect or engineer recommends for architectural or structural reasons, after a declaration and intimation to you. The explanation to that clause keeps structural change out of "minor". Adding area, changing height, cutting a wall, a column, a beam or a floor, or closing a required way in or out, is not a small edit.
A different change, to the sanctioned plans and specifications of the buildings or the common areas, needs the previous written consent of at least two-thirds of the allottees, other than the promoter, who have agreed to take apartments in that building. A clubhouse moved, a pool deleted, a smaller gym: that is a common-area question, not a taste question. (Real Estate (Regulation and Development) Act, 2016)
Section 13 bars the promoter from taking more than ten percent of the cost as an advance or application fee before a written agreement for sale is entered and registered. Do not fund a long amenity list on a booking form alone.
Where the list should sit in the agreement
Karnataka filings split the flat from the project. A public agreement uploaded in October 2025, for a plan sanctioned by the Anekal Planning Authority on 29 Aug 2025 (APA/CC/210/2025-26), puts flat specifications in Schedule D and project amenities in Schedule E. That Schedule E lists a compound wall, manned security at entry and exit, CCTV, a sewage treatment plant, a water treatment plant, rainwater harvesting pits, a clubhouse, a party hall, a gym, pools, play areas and a jogging track. It also describes standby generator cover for common-area lights, the sewage plant and the water pumps, plus a stated watt backup inside the flat.
That file is one project, not a city standard. It shows the shape of a useful schedule: a named item, a place, and a capacity. A brochure that says "smart access" and stops there has not done this.
An earlier public agreement, for a plan BBMP sanctioned on 12 Oct 2023 (LP No. BBMP/Addl.Dir/JDNORTH/0023/22-23), states connected power of 3 kW for a 2BHK and 4 kW for a 3BHK, and backup of 1 kW in the flat, with generator cover described for the common-area lift. If your draft gives a brand and no wattage, ask for the wattage. Brands get substituted. Watts are what the lift and the lights actually draw.
A short table for the visit
Use this on the draft, not on the hoarding. If a cell is blank in the papers, the line is not yet something you are paying for.
| What the gallery says | Where it has to appear | What you write down |
|---|---|---|
| Video door phone, app, or access control | Schedule D or E, and the sanctioned drawing if a room or a gate is involved | Make, where the panel sits, who holds the admin login after handover |
| Power backup | The electrical specification | Watts for the flat, and what the common areas and the pumps actually get |
| Sewage or water plant | Schedule E and the plan | Capacity, and whose bill runs it after the association takes over |
| Clubhouse, pool, court, hall | Sanctioned plan plus Schedule E | The room on the drawing, not only the render |
| Piped gas, intercom, AC point | Schedule D | Which rooms, and whether it is a point or a fitted machine |
| "Smart home" as a package | Nowhere, until it is broken into lines | Each device, or it is not a package |
Walk the same list on site. The site visit checklist covers the flat and the building around it. An amenity you cannot find on the drawing is a question, even if the model looks finished.
Running cost is part of the price
A sewage plant, a gym and a manned gate do not switch themselves off when you get the keys. Section 11(4)(d) makes the promoter responsible for essential services, on reasonable charges, until the association of allottees takes over maintenance. After that, the charge is yours.
Ask, in writing, which of these the monthly maintenance includes and which are extra: security payroll, diesel for the generator, power for the treatment plants, the pool, housekeeping, and the sinking fund for replacement. A low quote that leaves the plant out will not stay low. How a gate and a large common area change the bill, compared with a smaller building, is set out in gated community or a standalone building.
Section 14(3) is the repair clock, not a lifetime warranty. A structural defect, or another defect in workmanship, quality, provision of services, or any other obligation under the agreement, brought to the promoter within five years from handing over possession, is to be rectified without further charge within thirty days. After that, the association's fund pays. A cheap device with no stated life just arrives sooner in that fund.
What is worth paying for, in practice
Pay for water, waste, power and a way out in a fire. Those sit under approvals and under daily use. A treatment plant that is in the environment clearance and in Schedule E is a different object from a fragrance in the lobby.
Pay for backup only to the wattage written down. One filed agreement's 1 kW will run a few lights and a fan. It will not run an induction hob, a geyser and an air conditioner together. If you need more, the number has to change in the schedule before you sign, not in a WhatsApp note after.
A working, not a bill for a named project: that 1 kW backup, as the public agreement of 12 Oct 2023 stated for the flat, will not run a 2 kW geyser and an air conditioner at the same time. If diesel for the common generator is billed outside the maintenance quote, the "power backup" line on the brochure is not fully priced. Get the wattage and the diesel clause into the draft before you pay for the amenity.
Pay for a clubhouse when it is on the sanctioned plan, the area is stated, and who pays to staff it is written down. A device with no login handed to the association is a brochure line. If the draft only says the complex will be "smart", there is nothing to hand over.
Buyer checklist
- [ ] Sanctioned plan number and date copied, and the amenity rooms found on it
- [ ] Schedule D (the flat) and Schedule E (the project) read against the brochure, line by line
- [ ] Generator watts for the flat, and the list of common loads on backup
- [ ] Connected electrical load for your BHK written down
- [ ] Sewage plant, water plant and rainwater pits named, with who pays the power bill later
- [ ] Access-control logins named as handing to the association
- [ ] Monthly maintenance said to include, or exclude, each of those plants and the gate
- [ ] Any amenity on a civic-amenity plot checked before you count it
- [ ] Advance kept within ten percent until the agreement is registered
- [ ] Five-year defect line in the agreement left intact
Related reading
- Site visit checklist: inside the flat and around the building
- Gated community or standalone building: what changes
- Clubhouse on a civic amenity site
- Occupancy certificate and completion certificate
- Pet rules in a Bengaluru gated community
Due diligence checklist for Smart-home amenities: what to pay for
Frequently asked questions
No. The RERA Act speaks of plans, specifications, fixtures, fittings and amenities, not of a "smart-home package". A package exists only as named lines in Schedule D or E and on the sanctioned drawings. If the draft only says the complex will be smart, there is nothing to hand over and nothing to enforce.
Not casually. After those plans and amenities have been disclosed, section 14(2) requires previous written consent from at least two-thirds of the allottees, other than the promoter, for a change to the common areas. A clubhouse moved, a pool deleted or a smaller gym is that kind of change, not a taste question.
The agreement and the sanctioned plan. A brochure is an advertisement. Ask for the pool, with its room on the drawing, to be added to Schedule E before you sign. If the promoter will not add it, you are not buying a pool.
The promoter, on reasonable charges, until the association takes over maintenance, under section 11(4)(d). After that, the owners pay. Ask, in writing, which monthly charge covers the plant, the diesel and the operator, and which of those will sit outside the quote after handover.
Any amenity that is only in the gallery, and any backup that has a brand but no wattage. Do not fund a long amenity list on a booking form alone: section 13 caps the advance, before a registered agreement, at ten percent of the cost.
Paper note: This is not a legal opinion. Section numbers refer to the Real Estate (Regulation and Development) Act, 2016. The two agreements cited are public uploads of particular projects, used here as specimens of how a schedule looks, not as a comment on those projects. Checked 17 Nov 2026.
Sources
Checked 17 Nov 2026.
-
Real Estate (Regulation and Development) Act, 2016, sections 11(4)(d), 13, 14(1), 14(2) and 14(3). Ten percent cap before a registered agreement. Essential services until the association takes over. Completion as per sanctioned plans. Consent rules after disclosure. Five-year defect duty, thirty days to rectify: https://www.indiacode.nic.in/indiacode/bitstream/123456789/2158/1/A201616.pdf
-
Public agreement uploaded October 2025. Anekal Planning Authority sanction 29 Aug 2025, APA/CC/210/2025-26. Schedule D for the flat, Schedule E for the project, including security, CCTV, treatment plants and a clubhouse: https://img.staticmb.com/mbimages/reradoc/2025/10/27/5437855ProformaofAgreementforSale_2_2.pdf
-
Public agreement, BBMP plan of 12 Oct 2023, LP No. BBMP/Addl.Dir/JDNORTH/0023/22-23. Connected power 3 kW for a 2BHK and 4 kW for a 3BHK. Backup stated as 1 kW in the flat: https://img.staticmb.com/mbimages/reradoc/2024/08/28/5419681ProformaAgreementofSaleasperRERA_2_5.pdf
-
Assetz, a developer checklist aimed at new buyers. Used here only as an example of the amenity lists galleries circulate. It is not a sanctioned plan or an agreement: https://www.assetzproperty.com/blogpost/the-smart-amenities-checklist-every-new-age-homebuyer-should-have