How do you use the modular kitchen calculator?
- Measure the length of the base cabinets along the walls in feet. For an L or U shape, add up each side. This is the running length most quotes use.
- Enter the cabinet rate per running ft from your quote, the countertop rate per sq ft, and lump sums for accessories and appliances.
- Read the total. Countertop depth, GST and contingency are under “Adjust depth, GST and contingency”.
How is a modular kitchen priced?
Most designers quote cabinets per running foot of kitchen length. That rate already reflects the board, shutter finish and whether wall units are included, so ask what it covers. The countertop is priced per sq ft of top, which is the length times the depth, usually around 2 ft. Accessories such as baskets, tall units and soft-close hinges, and appliances such as a hob, chimney and sink, are often quoted separately.
How the cost is worked out
Running ft × cabinet rateRunning ft × depth × rate per sq ftSteps 1 + 2 + accessories + running ft × installation, plus GST if not quoted(Step 3 + appliances) × (1 + contingency)Worked example: 10 running ft
At a placeholder ₹ 12,000 per running ft, cabinets cost ₹ 1,20,000. A 10 × 2 ft countertop is 20 sq ft; at ₹ 1,000 per sq ft that is ₹ 20,000. Add ₹ 50,000 of accessories, ₹ 10,000 for installation and ₹ 1,00,000 of appliances. With 5% contingency the kitchen comes to ₹ 3,15,000, or ₹ 21,000 per running ft before appliances.
Worked example: a 16 ft U-shaped kitchen
A U shape with sides of 5, 6 and 5 ft is 16 running ft. At the same rates it comes to ₹ 4,09,500, with a 32 sq ft countertop costing ₹ 32,000.
What should you ask for in a kitchen quote?
- Whether the running ft rate covers base units only, or base and wall units, and which board and shutter finish it assumes.
- A list of accessories and hardware by brand and count, so quotes can be compared line by line.
- Whether the countertop, sink, plumbing and electrical changes are in the quote or extra.
Frequently asked questions
Related answers and guides
- Apartment Association Handover Under RERA
- Flat Possession Checklist Before Handover
- Delayed Possession Compensation RERA Karnataka Guide
- Final Checks Before Taking Possession: 25-Point List
Sources
- Running ft, area and percentage arithmetic as shown above.
- Cabinet, countertop and installation rates, accessories, appliances, depth, GST and contingency: your inputs; the defaults are placeholders. No market prices are assumed.
Indicative estimate for planning. Final cost depends on the design, materials and the designer’s quote. For GST, indicative only.
Doing up a home in Bengaluru? Talk to an acre&key advisor.