Ready-to-move or under construction in Bengaluru: what do GST and a delay actually add?

A finished apartment block beside a tower still under scaffolding, seen from a quiet approach road
GST exemption: 0% GST applies strictly if the entirety of consideration is paid post-Occupancy Certificate Under-construction GST: 5% standard rate (or 1% affordable: ≤60 sq m carpet & ≤₹45 lakh price) Cash difference: Extra ₹5L in non-financed cash on ₹1 Cr flat under construction Delay protection: Section 18 statutory delay interest (SBI highest MCLR + 2%)

Under Schedule II of the Central Goods and Services Tax (CGST) Act, residential apartments in Bengaluru attract zero GST only if the entire purchase consideration is received after the competent municipal authority issues the Completion Certificate (CC) or Occupancy Certificate (OC), or after first occupation. For under-construction apartments, GST is levied at 5% without input tax credit (or 1% for qualifying affordable housing under 60 square metres and ₹45 lakh). On a ₹1 crore transaction, choosing an under-construction unit adds ₹5 lakh in direct statutory taxes that home loans typically exclude from financing. In exchange for lower introductory pricing, under-construction buyers shoulder double carrying costs (rent plus pre-EMI interest), balanced against statutory compensation rights under RERA Section 18.

"Ready" on a hoarding is a sales word. The tax word is the date on the completion certificate, set against the dates you actually pay. A flat you can walk through can still carry GST if the cheque went out earlier.

When is GST nil, and when is it 5% or 1%?

From 1 April 2019 the effective GST on a residential apartment a promoter builds is 1% without input tax credit if the apartment is affordable, and 5% without input tax credit if it is not. Those rates cover new projects and ongoing ones, unless the promoter stayed on the older rates. (GST Council FAQ on real estate)

Affordable, for this rate, means both tests. Carpet area up to 60 square metres in a metropolitan city, and a gross amount charged of not more than ₹45 lakh. Bengaluru is on that metropolitan list, with Chennai, Delhi NCR, Hyderabad, Kolkata and Mumbai. Miss either test and the rate is 5%. A ₹40 lakh flat with a 65 square metre carpet fails the area test. A ₹46 lakh flat with a small carpet fails the value test.

The nil case is not "the building looks finished". Schedule II of the CGST Act treats construction intended for sale as a supply of service, except where the entire consideration is received after the completion certificate, or after first occupation, whichever is earlier. (CGST Act, Schedule II) One booking amount before that date pulls that payment back into the construction rule. Ask for the certificate date and line it up with your receipts. The longer breakdown, including a resale from an individual owner, is in the full cost of a Bengaluru flat.

Stamp duty does not switch off when GST does. Inside the Greater Bengaluru Area the ordinary total, outside a first sale up to ₹45 lakh, is 7.6% of the higher of price and guidance value. The lines are in the Karnataka stamp duty and registration calculator.

A ₹1 crore working: cash the loan does not replace

This is a working, not a quote for a project. Price and guidance value are both ₹1,00,00,000. The flat is outside the 1% band, because the price is over ₹45 lakh. Above ₹75 lakh the loan cap is 75% of the cost, and stamp duty and registration cannot be part of the financed cost above ₹10 lakh. (RBI Master Circular on Housing Finance)

Line Ready: entire price after the certificate Under construction at 5%
Price ₹1,00,00,000 ₹1,00,00,000
GST Nil ₹5,00,000
Duty, cess, surcharge and registration at 7.6% ₹7,60,000 ₹7,60,000
Down payment on a 75% loan ₹25,00,000 ₹25,00,000
Cash before lender fees and society charges ₹32,60,000 ₹37,60,000

The ₹5,00,000 gap is the GST. Some lenders fund it and some do not. Ask, in the sanction letter, before you treat ₹32.6 lakh as the number for both flats. If guidance value is higher than the price, the 7.6% is worked on the guidance value and both columns rise together.

Read the carpet area on the RERA agreement, not the super built-up figure on the brochure. On ₹40 lakh, 1% is ₹40,000 and 5% is ₹2,00,000. That gap is tax, not a discount.

What a delay costs, and what it only lets you claim

GST is paid as you are billed. A late tower does not refund it on its own. While you wait you also pay rent, or you pay the EMI on whatever the bank has already released. Those are cash. Section 18 is a claim.

If the promoter fails to finish or to hand over by the date in the agreement, and you did not ask for the delay, section 18 gives two routes. You may withdraw and seek the amount paid, with interest and compensation as the Act provides. Or you may stay, and the promoter pays interest for every month of delay until possession. The rate is the one the state prescribes. Karnataka Rule 16 uses the State Bank of India highest marginal cost of funds based lending rate plus 2%. The table, and a worked sum on money already paid, is in refund or interest under section 18. Put your own rent beside that page. This one will not invent a rent.

The RERA end date and the date in your agreement can differ. Read both. An extension is a document, not a chat. What to ask while the building is still going up is in 20 questions before an under-construction project.

The account, the 10% cap, and a certificate you can see

Under-construction money is supposed to be fenced. Section 4(2)(l)(D) requires 70% of the amounts realised from allottees to be kept in a separate account and used for land and construction. Section 13 says the promoter shall not take more than 10% as an advance without a registered agreement for sale. On the ₹1 crore working, 10% is ₹10,00,000. A token of ₹15 lakh "to block the unit" is ₹5 lakh over that line.

A ready flat bought from an individual owner is outside those two promoter rules. You are not funding a construction account. You are paying a person, and the bank will still want the khata, the occupancy certificate and a title it can mortgage. What the certificate proves, and what you take on if it is missing, is in the OC and CC guide linked below.

People already living in the building is not the Schedule II test. The test is the certificate, or first occupation if that came first, and whether your entire price came after it.

Ask both sellers for price, GST and government charges on separate rows. A sheet that still shows registration at 1% is using the fee from before 31 Aug 2025. The fee is 2%. A shorter pass over the same choice is in the first-time buyer guide.

The next step is one sheet with four rows for each option: price, GST, stamp and registration at current rates, and, for the under-construction flat, a delay cost you can live with if the RERA date slips. If either seller will not fill those rows, you do not yet have a comparison.

Checklist

Frequently asked questions

Only if the entire price is received after the completion certificate, or after first occupation, whichever is earlier. That is the exception in Schedule II of the CGST Act. A booking amount paid before the certificate can carry GST. A resale from an individual owner is not a construction service.

For a promoter, from 1 April 2019, it is 5% without input tax credit, or 1% without input tax credit if the apartment is affordable. Affordable means carpet area up to 60 square metres in Bengaluru and a gross amount not over ₹45 lakh. Both tests are required. Projects that stayed on the old rates are the exception the GST Council FAQ describes.

Not because of that label. The ordinary GBA total is 7.6% of market value, on the higher of price and guidance value. The lower first-sale slabs apply only up to ₹45 lakh. GST, where it applies, sits on top. It does not replace the duty.

On this page's working, with guidance value not above the price and a 75% loan, a ready flat needs ₹32,60,000 before lender fees: ₹25,00,000 down and ₹7,60,000 of duty and registration. The same flat under construction at 5% needs ₹37,60,000 if you pay the ₹5,00,000 of GST yourself. Your sanction letter may treat GST differently.

If you stay, section 18 requires interest for every month of delay at the rate Karnataka prescribes, which Rule 16 ties to SBI's highest MCLR plus 2%. If you leave, the claim is a refund of what you paid, with interest. Your rent until you move is your own cash. The worked rate is in the section 18 guide.

Section 13 says no more than 10% of the cost before a registered agreement for sale. On a ₹1 crore price that cap is ₹10,00,000. The section binds a promoter. A resale from an individual is a private contract, and your lawyer should set the advance.

CA and lawyer note: GST depends on your invoices and on who the seller is. The ₹1 crore column is a working at the rates cited above, not a project price. Confirm the tax with your CA and the agreement with your lawyer. Checked 17 Nov 2026.

Sources

Checked 17 Nov 2026.

  1. GST Council FAQ. From 1 April 2019, 1% without input tax credit if affordable, otherwise 5%. Affordable: carpet up to 60 square metres in a metropolitan city, including Bengaluru, and gross amount not over ₹45 lakh: https://www.gstcouncil.gov.in/sites/default/files/2024-02/faq-real-estate-sector.pdf

  2. CGST Act, Schedule II, paragraph 5(b). Nil only if the entire price is received after the completion certificate or first occupation, whichever is earlier: https://taxinformation.cbic.gov.in/content/html/tax_repository/gst/acts/2017_CGST_act/active/chapter21/scheduleii_v1.00.html

  3. RBI Master Circular on Housing Finance. 75% loan-to-value above ₹75 lakh. Stamp duty and registration not financed above ₹10 lakh: https://www.rbi.org.in/scripts/BS_ViewMasCirculardetails.aspx?id=12824

  4. RERA Act, sections 4(2)(l)(D), 13 and 18: https://www.indiacode.nic.in/indiacode/bitstream/123456789/2158/1/A201616.pdf